User Name Password


Change is the law of life. And those who look only to the past or present are certain to miss the future.
John F. Kennedy

        
 News   Barley   Malt   Hops   Beer   Whisky   Announcements   About Us 
Barley Malt and Beer Union RussiaBelgianShop áåëüãèéñêîå ïèâîÏðèëîæåíèå BrewMaltÁåëüãèéñêèé ñîëîä Castle Malting

V-Line News V-Line Search news archive V-Line
V-Line-200

UK: Diageo to build a $120 million bioenergy distillery
Brewery news

Diageo, the major UK drinks multinational, plans to build a bioenergy facility at Scotland’s largest distillery, Cameronbridge in Fife, Environmental Leader reported on August 17.

A formal partnership agreement signed with energy management company Dalkia presupposes the creation of a new facility for a cost of approximately $120 million.

The facility will, for what Diageo says is the first time, integrate sustainable technologies - including anaerobic digestion and biomass conversion - on a commercial scale. It will be the largest single investment in renewable technology by a non-utility company in the UK and is set to reduce annual CO2 emissions at the site by approximately 56,000 tonnes.

It was announced that the proposed facility, which is subject to planning approval, will recover 98% of thermal steam and 80% of electrical power at the distillery.

The construction is to be completed over two years. Then it will be transferred to Diageo under a finance lease, while continuing to be managed by Dalkia.

The bioenergy facility will generate renewable energy from “spent wash” - a mixture of wheat, malted barley, yeast and water - produced during distillation. The spent wash is separated into liquid and dried solids. The liquid is then converted, via anaerobic digestion, into biogas and the dried solids form a biomass fuel source.

Around 90,000 tonnes of co-products, which would have required transport off-site by road, will be turned into bioenergy in the form of electricity and steam for use at the distillery. The facility will also recover almost a third of the site’s water requirements.

19 August, 2008
V-Line-200 V-Line-200
 Account Handling Page   Terms and Conditions   Legal Disclaimer   Contact Us   Archive 
Copyright © e-malt s.a., 2014